![]() ![]() With the project’s scope, it would be impossible to complete it in five years, so the township will also approve a developer’s agreement that allows the developer, Tishman Speyer, to continue with the project through the estimated 20-year horizon without additional zoning changes. “This property warrants a master plan just because of its size, its location within the City Avenue District, and its role as one of the most productive economic parcels within the township,” Leswing said.Īccording to Leswing, the municipal planning code allows the developer to be protected from zoning changes for five years after township approval. The 2 Bala Plaza site will include two residential buildings with ground-floor retail. One amenity will be called Bala Park, which will include an amphitheater. The plan for part one is the construction of three office buildings, residential buildings, a parking garage, a hotel, two standalone commercial buildings and amenities. The second part of the overall project is the 10-story office building called 2 Bala Plaza, located at 333 City Ave. A sea of parking lots surrounds the buildings. ![]() The Bala Plaza 1 and 3 site currently has three buildings, two seven-stories and one six-story. Asaphs Road, otherwise known as 1 and 3 Bala Plaza. ![]() The project, which is planned to take decades to complete, calls for hundreds of new apartment units, office space, commercial development, and open spaces through parks and trails.įor purposes of the redevelopment, the site is being viewed in two parts. LOWER MERION – Lower Merion officials tabled a planned vote on the long-term redevelopment plans for three Bala Plaza sites in Bala Cynwyd. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |